• Home
  • Contact Us
Compusoft Engineering
  • Home
  • About Us
  • Engineering Services
  • Engineering Software
  • Projects
  • Publications
  • Our People
  • Contact Us
Seismic Assessment/Retrofit Princes Wharf Development Compusoft Engineering has considerable research and project experience in the seismic assessment… Read more here »
Tension Membrane Structures Crete 2 Tension membrane structures combine elegant forms with cost efficiency, performance and function.… Read more here »
Engineering Analysis Platinum Tower 3D Model ENGINEERING ANALYSIS Compusoft Engineering provides a comprehensive engineering analysis… Read more here »
Structural Design St James Compusoft Engineering offer a range of structural engineering design services; * RETROFIT… Read more here »
Vibration Mitigation Engineering Vibration Compusoft Engineering has expertise and experience in the measurement, analysis and solution of… Read more here »
Structural Testing BCJtest Compusoft Engineering are specialists in arranging, managing, and reporting a wide range of… Read more here »

Middlemore Kidz First Canopy, Auckland, NZ

Kidzfirst
Middlemore 2

Location: Middlemore Hospital, Auckland, New Zealand

Architect: Chow Hill Architects

Fabric Designer: COMPUSOFT ENGINEERING

Structural Engineering: COMPUSOFT ENGINEERING

Fabric Contractor: Structurflex

Type of Fabric: 702T

A classic form extended to maximise its function, this canopy successfully increases the hospital accessibility and visibility. Construction time was limited for this project because of the importance of the facility. Effective construction planning during the design phase meant that this was achieved in time and under budget without compromising the high level of durability demanded by this important Public facility.

  • Go back to:
  • ↑ Top

© 2009 Compusoft Engineering | Information Age